Référence fabricant
MDD255-22N1
Diode Array 1 Pair Series Connection Standard 2200 V 270A Chassis Mount Y1-CU
IXYS MDD255-22N1 - Spécifications du produit
Informations de livraison:
ECCN:
Informations PCN:
Subject: Inner box packing Label update for Medium Power modules Littelfuse would like to notify you about implementing inner packing box label change for its Medium Power Modules built in our different assembly locations. To harmonize the marking, we will remove Pb-Free marking which is not relevant to all our products portfolio and will only show up a "RoHS compliant" logo which is appropriate to all our power modules. There is no change to fit, form or function of the existing products as the change refers to packing box labelling only.Implementation date: May 1st, 2023 - already in place at some warehouse locations
SUBJECT: Assembled Device Marking Format Changes and Outer Box/Bag Label Format Changes - Change to the assembled device marking format The change affects the date code and tracking number identification. This change does not affect the form, fit or function of the product. See attached for more details - Change to the box label format: The paper sticker label found on the outer box or bag will see a format change that incorporates the Littelfuse logo along with the IXYS logo. The printed information remains the same (PN, Qty, Lot #, date code, country of origin). The change allows for a improved readability. This change does not affect the form, fit or function of the product. REMARKS: This changes from the original IXYS Corporation marking/labeling format to the new IXYS LLC-USA format is being done to conform to the SAP product management system requirements of our parent company Littelfuse Corporation.
Subject: PCN for Y1 Power Modules Inhouse Assembly Location Transfer MCC/MCD/MDD/MCMA/MDMA/MDNA types only REASON OF CHANGE: State-of-the-art power semiconductor assembly capabilities to dramatically improve service levels to customers. Our target is to set this factory as a world class facility with automated, error proof processes to meet the highest quality standards. Parts availability: Week of October 03rd, 2022 (Week 40/2022) Production ramp-up October 20th, 2022 (Week 42/2022) Last Shipment: Till week 50/2022 from the actual back-end site
As informed already in 2021 and after the successful relocation of our TO-240 and Y4 product families, I am pleased to announce we are preparing to consolidate and transfer the next power modules back end operations to our new facility located in Lipa city, the Philipines over the coming months. This new Littelfuse facility combines the very best operational excellence and semiconductor expertise to deliver a highly automated, world class facility designed, to meet IATF16949 & VDA6.3 requirements. Our clear focus being to bring high levels of service to our customers and quality products to support future growth of the power semiconductor business.
We want to share with you a brief update on the Littelfuse power semiconductor manufacturing site in Lampertheim, Germany. The site recently experienced an electrical fire that occurred at the power distribution panel on the subfloor of the fab. All employees were safely evacuated, and the site has resumed some operations. The fire did not spread to the manufacturing floor, but this unforeseeable event will cause an interruption to our production. As a result of this incident, despite our urgent recovery actions, you will encounter approximately a 10 week delay to your current delivery schedule for our thyristors rectifier, and fast diodes, as well as any module that includes these components. We sincerely apologize for the inconvenience. Your Littelfuse Customer Service Representative will make the necessary adjustments to your order and also contact you if there are any further changes to this schedule. Please understand that our entire global team is diligently working to resolve this issue as fast as possible to minimize your disruption.
Statut du produit:
Emballages disponibles
Qté d'emballage(s) :
3 par Bulk